Perth Metro · South-West · Pilbara · Goldfields
PRV Calibration & Certification Across WA
Set-pressure testing, calibration and AS1271 certification of pressure relief valves. In-house or mobile on-site with pick-up and delivery options.
In-house PRV recievables prior to 10:00am – certified and despatched next day.
What this service covers
- Set-pressure testing and calibration to AS 1271
- Seat tightness testing to API 527
- In-house repair; replacement quoted when necessary
- Durable tagging and re-certification
- Valve removal, mobilisation and workshop storage options
- Rotable exchange - no shutdown, no downtime required
Safety relief and pressure relief valves.
- Compressed Air
- Steam
- Water
- Process gas
Turnaround
- Received before 10:00am; 24 hours.
- Received post 10:00am; 24-48 hours.
Getting valves to Us
- Pick-up and delivery options available.
- Drop to the Yangebup workshop or depot.
- Mobile fleet for onsite testing where access, isolation or urgency requires it
- Mobilisation for on-site testing incurs extra costing
Applicable Standards
| Reference | Title | What it governs |
|---|---|---|
| AS 1271:2003 | Safety valves, other valves, liquid level gauges and other fittings for boilers and unfired pressure vessels | The valve itself; design, construction and testing |
| API 527 | Seat Tightness of Pressure Relief Valves | Seat leakage acceptance |
| AS 1210:2010 | Pressure vessels | The vessel the valve protects |
| AS 3788:2024 | Pressure equipment – In-service inspection | The in-service inspection regime |
| WHS Regulations (WA) | Work Health and Safety (General/Mines) Regulations 2022 | Your duties as PCBU and/or operator. |
How it Works
- Send the details
Quantity, thread type and size, medium, set pressure. A nameplate photo covers most of it.
- Quote and schedule
Priced and dated against your compliance due date and site access requirements.
- Test and calibrate
Set-pressure testing to AS 1271 under controlled conditions. Seat tightness to API 527.
- Repair or replace
In-house. Re-tested and re-certified before return.
- Tag, certify, record
Durable tag fitted, PRV Test Certification to AS 1271 issued, records loaded to your client portal. Asset tracked for next complaince due dates.
Every Certificate. Every Due Date. Tracked 24/7.
A live asset register, not a document file.
- Dashboard access across every asset and certificate. Search, filter and auto-generate spreadsheets for reporting and audit. Reminders at 90 days, 30 days, and when a certificate is overdue. Accessible 24/7, current at all times.
Audit-ready. Complete compliance register exports in one step – no reconstructing it from certificates in a drawer.
Frequently Asked Questions
Quantity, thread type and size, medium, and set pressure. Manufacturer and model help but aren’t essential. A nameplate photo covers most of it — attach it to the booking form.
Received at the Yangebup workshop before 10:00, certified and returned next day. Received after 10:00, 24 to 48 hours.
Yes – we run a mobile testing fleet. Onsite suits emergency work, or where a valve cannot be isolated or removed. Site access and induction requirements make it slower and more expensive than workshop testing, so workshop is the default unless there’s a reason it can’t be.
Yes. Pick-up and delivery is available for a fee, or you can organize your own freight to DGE.
Yes. Rotable PRV exchange options can put a tested and tagged valve on while yours comes off. No shutdown. No Downtime.
You’ll still receive an AS1271 certification, to record this and keep documentation trace. DGE can provide a quote for a like-for-like replacement.
The portal holds the current certificate for every asset, with its due date, and can export the whole register in one step. What an auditor asks for, you can produce on the spot.
Yes. The portal displays reminders at 90 days, at 30 days, and again once a certificate is overdue. You will have a DGE asset manager assigned to your client portal – they will be in touch at an agreed timeframe well before your due date lapses. You don’t have to track due dates manually.
Related Services
A tested valve on while yours comes off. No shutdown, no downtime.
In-service inspection of pressure vessels to AS 3788.
Search, filter, export. Automatic certification reminders at 90 and 30 days.
PRV due?
Send the nameplate photo and set pressure. We’ll come back with a price and a date.