Home / Inspection & Certification Services / Pressure Vessel Inspections
Perth Metro · South-West · Pilbara · Goldfields
Pressure Vessel Inspections Across WA
In-service and commissioning inspection of pressure vessels, pressure piping and pressure-relief devices to AS 3788. Inspectors holding AICIP, API or equivalent certification, onsite across Western Australia.
AS3788 Pressure Vessel Inspection Report, tracked due date for next interval date.
What this service covers
- Commissioning inspection of new and newly installed equipment
- Hazard Level A to D as per standards. Hazard Level E only if requested.
- Internal, external and targeted examination
- Carried out online or offline, as the scope requires
- Condition monitoring ultrasonic thickness testing, included in the report
- In-service inspection of pressure vessels, pressure piping and pressure-relief devices to AS 3788
Intervals & Records
- r. 224 of the WHS Regulations requires pressure equipment to be inspected on a regular basis by a competent person - $4,200 for an individual, $21,000 for a body corporate apply
- Intervals set by AS 3788 Table 4.1, or by your risk-based inspection program
- Extended intervals and allowable deferrals assessed where AS 3788 permits
- Equipment file, register and inspection reports maintained to AS 3788 Section 8
- Plant registration lodgement and Manufacturer's Data Report retrieval
- Replacement data plates marked and Gauges provided as per AS 1210 requirements
- Due dates tracked, with reminders at 90 days, 30 days and overdue
Personnel & Preparation
- Inspectors holding AICIP, API or equivalent certification
- Access permits, isolation and lockout arranged with you
- Site induction requirements accounted for in scheduling
- Cleaning and preparation confirmed prior to mobilisation
- Closure and return to service documented
- Larger or grid-mapping ultrasonic scopes project managed with qualified NDT technicians
Applicable Standards
| Reference | Title | What it governs |
|---|---|---|
| AS 3788:2024 | Pressure equipment — In-service inspection | The in-service inspection regime |
| AS 1210:2010 | Pressure vessels | Design and construction, data plate marking, protective devices |
| AS 4343:2014 | Pressure equipment — Hazard levels | How a vessel’s hazard level is determined |
| AS 4037:1999 | Pressure equipment — Examination and testing | Examination and test methods |
| API 510 | Pressure Vessel Inspection Code | Inspection, rating, repair and alteration |
| WHS Regulations (WA) | Work Health and Safety (General/Mines) Regulations 2022 | r. 224 – pressure equipment must be inspected on a regular basis by a competent person. r. 213 – maintenance, inspection and testing by a competent person. Both carry penalties. |
How it Works
- Inspection strategy
Which route applies to your equipment; inspection interval requirements are stipulated in AS 3788 Table 4.1, or governed by a risk-based inspection program.
- Scope
Agreed upon by PCBU and inspector, some examples include commissioning, internal, external, online or offline.
- Inspection plan
Access, isolation, permits, cleaning and preparation agreed prior to mobilsation.
- Inspection
Examination carried out as per steps 1-3 by competent person.
- Documentation
Inspection report issued, equipment file and register updated, next due date set. All of uploaded and downloadable 24/7 to your client portal.
Every Certificate. Every Due Date. Tracked 24/7.
A live asset register, not a document file.
- Dashboard access across every asset and certificate. Search, filter and auto-generate spreadsheets for reporting and audit. Reminders at 90 days, 30 days, and when a certificate is overdue. Accessible 24/7, current at all times.
Audit-ready. Complete compliance register exports in one step – no reconstructing it from certificates in a drawer.
Frequently Asked Questions
Vessel serial number, plant registration number, design registration number, vessel type and last inspection date. Site address plus any access or induction requirements. An asset folder or an asset register spreadsheet covers all of it; both of which you can attach to the booking form.
AS 3788 requires inspection by a competent person. DGE Inspectors hold AICIP, API or equivalent certification.
Pressure vessels, pressure piping and pressure-relief devices. Hazard Level A to D as standard, Level E on request, classified to AS 4343. We also carry out commissioning inspection on new and newly installed equipment, which catches marking and documentation problems while they are still cheap to fix.
Not necessarily. Inspections are carried out online or offline, and which applies depends on the scope as detailed above. AS 3788:2024 sets out where each is appropriate. Online inspection can reveal conditions that are not observable once equipment is shut down. Access permits, isolation and cleaning requirements are agreed with you beforehand.
Intervals are set by AS 3788 Table 4.1, or by a risk-based inspection program where you run one. We also assess extended internal intervals and allowable deferral, which AS 3788 provides for in defined circumstances, case by case against your equipment’s condition and history. Equipment sitting idle still carries obligations. Send your asset documentation and/or asset register and we’ll confirm all of it in writing.
It does not condemn the vessel. AS 3788 provides for missing documentation and name plates to be developed and validated by a competent person, and for inadequate marking to be reinstated. We retrieve Manufacturer’s Data Reports where they exist, supply replacement data plates marked to AS 1210, handle plant registration lodgement, and supply gauges to AS 1210. See Documentation Gap Analysis for more.
Should you engage DGE – everything sits within your Asset Management Client Portal; current report for every item, its due date, and the equipment history. The whole register exports in one step, so what an auditor asks for you can produce on the spot. Reminders generate at 90 days, at 30 days, and again once an inspection is overdue. Your assigned DGE Asset Manager will send you email notification at an agreed timeframe prior to each inspection.
Related Services
Set Pressure Testing and Certification to AS1271.
A tested valve installed, while yours come off. No shutdown. No downtime.
Search, filter, export. Automatic certification reminders at 90 and 30 days.
Inspection Due?
Send your asset information or asset register. We’ll come back with a price and a date.